|
| Status: | Complete: | ||
| Importance: | Urgency: | ||
| Release: |
Description
Currently only one release can be assigned to an iteration.
It would be better if multiple releases could be assigned to an iteration. In this way – releases of different projects could be scheduled for the same iteration if desired.
This links to the problem of releases listing all issues contained within the iteration.